  1. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  2. Traffic pattern change on US 52 beginning 8/31/18 between CR 400 S & CR 800 S

    August 31, 2018, 7:00 AM - October 31, 2018, 5:00 PM

    Rieth-Riley will be changing the traffic pattern on US 52 from 8/31/18 to 10/31/18. Moving Eastbound lane into the original drive lane. Westbound driving lane will be moving through the crossovers into the Eastbound passing lane while maintaining two-way traffic. This change will take place between CR 400 S. and CR 800 S. Contact: J. R. Beaman 765-404-4750

    More Details
  3. Main Street Closure -

    September 17, 2018, 12:15 PM - October 26, 2018

    Beginning monday September 17th the City will be closing Main Street to through traffic in between Kossuth Street and Perdue Street. construction work will be taking place at the intersection of 21st Street and Main Street and where Wallace Street and Congress Street intersect Main Street. There will be hard barricades at the following intersections, Perdue and Main, Wallace and Main, and 21st and Main, no traffic will be allowed past those points. This closure will be until approximately October 26th, 2018. The detour will be Kossuth Street, South 18th Street and Perdue Street.

    More Details
  4. Sidewalk Closure @ 301 South St 9/28 to 10/12 remove & replace sidewalk & ramp.

    September 28, 2018, 7:00 AM - October 12, 2018, 5:00 PM

    Tonn and Blank Construction will have sidewalk closed at 301 South Street from 9/28/18 to 10/12/18 for removal and replace of sidewalk and ramp. Ther will also be parking spots as well closed off for dumpster. There will be ADA compliant signage and barricades. They will also have fencing around construction site. Contact: Kirt Hunter 317-618-6246

    More Details
  5. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  6. Road Closure-Main St from 6th to 7th St & 6th St from Main to Ferry 10/6 from 10AM to 10/7 at 2AM

    October 6, 2018, 10:00 AM - October 7, 2018, 2:00 AM

    Main Street Live will have the following road closures for a live concert event on 10/6/18 from 10 AM to 10/7/18 at 2 AM. Main Street between 6th Street and 7th Street including sidewalks and the intersection of 6th Street and Main Street along with 6th Street between Main Street and Ferry Street. Contact: Nathaniel Pientok 765-237-7049