  1. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  2. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  3. Alley Closure-West side of City Hall from Columbia to South St. 10/16 - 12/15

    October 16, 2018, 7:00 AM - December 15, 2018, 5:00 PM

    Star City Crossing will have the Alley Closed on the West side of City Hall for the construction of a new building. This closure will be from 10/16/18 to 12/15/18. There will be Barricades with flashing lights and signage 'Road Closed' placed at entrance to alley. Contact: Jon Caron 765-414-3995

    More Details
  4. Road Closure-Wallace St 10/29/18 to 5/24/19 for Loeb Stadium watermain installation

    October 29, 2018, 7:00 AM - May 24, 2019, 5:00 PM

    Bowen Engineering will have Wallace Ave. and 24th St. shut down from 10/29/18 to 5/24/19. The intersection of Brice St. and 24th St. will be shut down for the majority of the project. There will be approx. a 3-4 week period when Brice St. between 24th St. and Park Ave. will be shut down to all traffic. Watch for lots of heavy equipment. Watch for Directional Signage, Detour signage, Road Closed signage, barricades, barrels and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  5. Alley Closure behind 1007 Main St. 11/20-12/21 building demolition

    November 20, 2018, 7:00 AM - December 21, 2018, 5:00 PM

    K A Contracting will have the Alley behind 1007 Main Street Closed from 11/20/18 to 12/21/18 for building demolition. Contact: Michael Kaiser 765-479-3285

    More Details
  6. Road Closure @ Canal Rd & Greenbush St 11/26 - 12/7/18 for the CSO Tank Project

    November 26, 2018, 7:00 AM - December 7, 2018, 5:00 PM

    Bowen Engineering will have the Road Closed at Canal Rd. and Greenbush St. from 11/26/18 to 12/7/18 to work on the CSO Tank. (Accual closure will be on Canal Rd.) Watch for directional signs and detour signs through the area. Watch for construction traffic and workers that will be in the area. Contact: Thomas Currie 317-318-5635

    More Details
  7. Main Street Sidewalk & Parking Closure

    November 29, 2018, 2:00 PM - November 30, 2018, 5:00 PM

    K A Contracting will be closing the Sidewalk and Parking on the south side of Main Street between 10th Street & 11th Street today Thursday 11-29 & Friday 11-30 for a building demolition. Contact: Michael Kaiser 765-479-3285 KA Contracting

    More Details
  8. Lane Shift on Southbound lane @1112 S 4th St 11/30 from 7am-5pm to install gas service

    November 30, 2018, 7:00 AM - 5:00 PM

    Patton Construction will have a Lane Shift on the Southbound lane North of Owen St. at 1112 S. 4th Street to install a gas service. This will be on 11/30/18 from 7am to 5pm. Watch for signage and cones directing traffic flow. Contact: Duffy Anthrop 765-418-7575