Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Restore Sagamore - Sagamore Parkway between Kossuth St & South St Lane Restrictions

    March 13, 2017 - August 1, 2018

    Beginning Monday March 13, 2017 Milestone Contractors will be restricting one lane in each direction on Sagamore Parkway between Kossuth Street and South Street. These restrictions will be through the duration of the project ending July 2018. Contact: Ethan Cinatl Contractor: Milestone Contractors Contact Office: 765-772-7500

    More Details
  2. Alley Closure-between 4th & 5th St. from Main to Columbia St.

    March 1, 2018, 7:00 AM - May 31, 2018, 5:00 PM

    Morgan Constructors LLC will be closing alley between 4th St. & 5th St. from Main St. to Columbia St. for placement of dumpster for clean out/renovation of building. Closure will be from 3/1/18 to 5/31/18. Contact: Tim O'Bryan (Morgan Constructors LLC) 765-427-9213

    More Details
  3. Road Closed to through traffic on Poland Hill Rd. from 300 S. to Veterans Memorial Pkwy

    March 5, 2018, 6:00 AM - April 1, 2018, 6:00 PM

    Road Closed to through traffic on Poland Hill Rd. between 300 S. & Veterans Memorial Pkwy. for Wea Creek bridge repair. Road is open from 300 S. along Poland Hill Rd. to Little Rock Rd. to access Stonewick Subdivision. HSS has traffic control in place, 'ROAD CLOSED' signs at both ends of Poland Hill Rd. along with barricades. Closure will be from 3/5/18 to 4/1/18. Contact: Rick Yates 765-299-6089

    More Details
  4. Moving Road Closure-Prairie Ln for watermain reconstruction 3/19 to approx. 4/20

    March 19, 2018, 6:00 AM - April 20, 2018, 6:00 PM

    Plant Bros. Excavation will be having a Moving Road Closure on Prairie Ln. for watermain reconstruction. Closure will be from the intersection of Elmwood Ave. & Prairie Ln. along Prairie Ln. to the East & South to the intersection of Vinton St. & Prairie Ln. Closure will change location throughout the project as the pace of construction moves forward. Closure area will be contained to area where contractors will be working. Area will be approximately a 200' area at a time. Watch for traffic control signage and orange barrels. Trench will be backfilled and covered ready for traffic at the end of each day. At the end of the working day between 6 PM and 7:30 AM, Prairie Ln. will resume regular traffic flow. Regular traffic flow for Sat. & Sun. as well. Contact: Jesse Plant, project manager. 812-208-0803.

    More Details
  5. Alley Closure between 5th St. & 6th St. from Columbia to Main St. 3/24/18 to 3/25/18.

    March 24, 2018, 8:00 AM - March 25, 2018, 6:00 PM

    The Lahr Apartments will be closing alley between 5th & 6th St. from Columbia St. to Main St. for window replacement. Running a little behind with installation. Closure will be from Sat. 3/24/18 to Sun. 3/25/18. Contact: Jenaye Hughes 317-450-6956.

    More Details