  1. Restore Sagamore - Sagamore Parkway between Kossuth St & South St Lane Restrictions

    March 13, 2017 - August 1, 2018

    Beginning Monday March 13, 2017 Milestone Contractors will be restricting one lane in each direction on Sagamore Parkway between Kossuth Street and South Street. These restrictions will be through the duration of the project ending July 2018. Contact: Ethan Cinatl Contractor: Milestone Contractors Contact Office: 765-772-7500

    More Details
  2. Alley Closure-between 4th & 5th St. from Main to Columbia St.

    March 1, 2018, 7:00 AM - May 31, 2018, 5:00 PM

    Morgan Constructors LLC will be closing alley between 4th St. & 5th St. from Main St. to Columbia St. for placement of dumpster for clean out/renovation of building. Closure will be from 3/1/18 to 5/31/18. Contact: Tim O'Bryan (Morgan Constructors LLC) 765-427-9213

    More Details
  3. Road Closure-Grove St. between S. 14th St. & S. 17th St. 3/26 to 5/25 for New Sanitary Sewer

    March 26, 2018, 6:00 AM - May 25, 2018, 6:00 PM

    Bowen Engineering will be closing Grove St. between S. 14th St. & S. 17th St. for the installation of a new sanitary sewer main. Closure will be from Mon. 3/26/18 to approximately Fri. 5/25/18. Working hours will be 7:30 AM to 5:00 PM. Contractor has been in contact with the residents via door to door visits and fliers. Through traffic will not be permitted and access will be restored as quickly as possible. Traffic control will be in place - there will be signage, barrels and barricades. Contact: Scott Heizelman with Bowen Engineering 317-719-2767.

    More Details
  4. Lane Restrictions-US 52 South between Teal Rd & CR 775 E also Teal Rd from 30th St to US 52 S.

    April 2, 2018, 6:00 AM - September 8, 2018, 6:00 PM

    Rieth-Riley will be having numerous lane restrictions and closures throughout the project. Lane restrictions and closures will begin on Teal Rd. from S. 30th St. to US 52 S. They will continue at the intersection of Teal Rd. and US 52 S. heading South to the end of the project at CR 775 E. Contractor will be sending in updates throughout the project so that any modifications can be added to the road closure request, keeping it current. Traffic control will be in place at all times. Watch for flagmen, signage, barricades and barrels. Restrictions and closures will be from 4/2/18 to 9/8/18. Contact: Jeff Bond with Rieth-Riley 765-585-7758.

    More Details
  5. Road Closure-South St. between Earl Ave & Sagamore Pkwy & between Sagamore Pkwy & Hamman St.

    April 2, 2018, 6:00 AM - July 15, 2018, 7:00 PM

    Milestone Contractors will be closing South St. on April 2nd before rush hour traffic. Two sections will be closed to traffic. South St. will be closed between Earl Ave. & Sagamore Pkwy. South St. will be closed between Sagamore Pkwy. and Hamman St. Businesses along the closed section can be accessed using Sagamore Pkwy. (Sagamore Pkwy. will remain open during construction). The eastbound detour for the through traffic will be diverted to Earl Ave., then Union St., then to Creasy Ln. and back to South St. The westbound detour for the through traffic will be diverted to Creasy Ln., then Union St., then to Earl Ave. and back to South St. Traffic Control signage, barricades and barrels will be in place. Closure will be from 4/2/18 to 7/15/18. Contact: Ethan Cinatl, project manager 765-412-0933

    More Details
  6. Lane Restrictions on S. 18th St. between Central & King St. for new gas main

    April 19, 2018, 7:30 AM - May 18, 2018, 5:00 PM

    Patton Construction will have Lane Restrictions on S. 18th St. between Central St. & King St. for the hydro-excavating and installation of a new gas main. Contractors will have vehicles along the West side of S. 18th St. to install main. Once complete, will switch to the East side to install main. Watch for Cones/Signs/Flaggers to keep traffic flowing. Construction activities will be from 7:30 AM to 5:00 PM 4/19/18 to 5/18/18. Contact: Justin Lubke with Patton Construction 765-543-5472.

    More Details
  7. Lane Closure at 136 Elston Rd. between Powder House Ln. & Breckenridge St. Duke Energy working on pole

    April 25, 2018, 7:00 AM - April 26, 2018, 5:00 PM

    Duke Energy will have a lane closure at 136 Elston Rd. to upgrade equipment on power pole. Watch for flagmen and traffic control. 4/25/18 to 4/26/18. 7 AM to 5 PM daily. Contact: Brad Kesler 765-413-1750