  1. Restore Sagamore - Sagamore Parkway between Kossuth St & South St Lane Restrictions

    March 13, 2017 - August 1, 2018

    Beginning Monday March 13, 2017 Milestone Contractors will be restricting one lane in each direction on Sagamore Parkway between Kossuth Street and South Street. These restrictions will be through the duration of the project ending July 2018. Contact: Ethan Cinatl Contractor: Milestone Contractors Contact Office: 765-772-7500

    More Details
  2. Alley Closure-between 4th & 5th St. from Main to Columbia St.

    March 1, 2018, 7:00 AM - May 31, 2018, 5:00 PM

    Morgan Constructors LLC will be closing alley between 4th St. & 5th St. from Main St. to Columbia St. for placement of dumpster for clean out/renovation of building. Closure will be from 3/1/18 to 5/31/18. Contact: Tim O'Bryan (Morgan Constructors LLC) 765-427-9213

    More Details
  3. Road Closure-Grove St. between S. 14th St. & S. 17th St. 3/26 to 5/25 for New Sanitary Sewer

    March 26, 2018, 6:00 AM - May 25, 2018, 6:00 PM

    Bowen Engineering will be closing Grove St. between S. 14th St. & S. 17th St. for the installation of a new sanitary sewer main. Closure will be from Mon. 3/26/18 to approximately Fri. 5/25/18. Working hours will be 7:30 AM to 5:00 PM. Contractor has been in contact with the residents via door to door visits and fliers. Through traffic will not be permitted and access will be restored as quickly as possible. Traffic control will be in place - there will be signage, barrels and barricades. Contact: Scott Heizelman with Bowen Engineering 317-719-2767.

    More Details
  4. Lane Restrictions-US 52 South between Teal Rd & CR 775 E also Teal Rd from 30th St to US 52 S.

    April 2, 2018, 6:00 AM - September 8, 2018, 6:00 PM

    Rieth-Riley will be having numerous lane restrictions and closures throughout the project. Lane restrictions and closures will begin on Teal Rd. from S. 30th St. to US 52 S. They will continue at the intersection of Teal Rd. and US 52 S. heading South to the end of the project at CR 775 E. Contractor will be sending in updates throughout the project so that any modifications can be added to the road closure request, keeping it current. Traffic control will be in place at all times. Watch for flagmen, signage, barricades and barrels. Restrictions and closures will be from 4/2/18 to 9/8/18. Contact: Jeff Bond with Rieth-Riley 765-585-7758.

    More Details
  5. Road Closure-South St. between Earl Ave & Sagamore Pkwy & between Sagamore Pkwy & Hamman St.

    April 2, 2018, 6:00 AM - July 5, 2018, 7:00 PM

    Milestone Contractors will be closing South St. on April 2nd before rush hour traffic. Two sections will be closed to traffic. South St. will be closed between Earl Ave. & Sagamore Pkwy. South St. will be closed between Sagamore Pkwy. and Hamman St. Businesses along the closed section can be accessed using Sagamore Pkwy. (Sagamore Pkwy. will remain open during construction). The eastbound detour for the through traffic will be diverted to Earl Ave., then Union St., then to Creasy Ln. and back to South St. The westbound detour for the through traffic will be diverted to Creasy Ln., then Union St., then to Earl Ave. and back to South St. Traffic Control signage, barricades and barrels will be in place. Closure will be from 4/2/18 to 7/5/18. Contact: Ethan Cinatl, project manager 765-412-0933

    More Details
  6. Lane Restrictions on S. 18th St. between Central & King St. for new gas main

    April 19, 2018, 7:30 AM - May 18, 2018, 5:00 PM

    Patton Construction will have Lane Restrictions on S. 18th St. between Central St. & King St. for the hydro-excavating and installation of a new gas main. Contractors will have vehicles along the West side of S. 18th St. to install main. Once complete, will switch to the East side to install main. Watch for Cones/Signs/Flaggers to keep traffic flowing. Construction activities will be from 7:30 AM to 5:00 PM 4/19/18 to 5/18/18. Contact: Justin Lubke with Patton Construction 765-543-5472.

    More Details
  7. Lane Closure on East side of 14th St. between Adams & Virginia St. 4/30 to 5/4 for sewer lateral repair.

    April 30, 2018, 6:00 AM - May 4, 2018, 6:00 PM

    Property Solution Contractors will have the East lane on S. 14th St. between Adams St. & Virginia St. closed for sewer lateral repair. Lane closure will be 4/30/18 to 5/4/18. Watch for One Lane Ahead signs at Virginia St. and at Adams St. There will be orange barrels and fence around hole. Contact: Joe Kepner 765-404-8776

    More Details
  8. Moving Sidewalk Closure at Lahr Apts. installing windows along 5th St. & Columbia St.

    April 30, 2018, 6:00 AM - May 11, 2018, 6:00 PM

    Lahr Apts. will have a Moving Sidewalk Closure along their building on 5th St. and Columbia St. for the installation of exterior storm windows 4/30/18 to 5/11/18 between 6 AM and 6 PM. A lift will be used in the project. Lift will be parked in a parking space over night when not in use. Cones will be lined up along sidewalk with closure signs where lift is being operated. Contact: Jenaye Hughes 317-450-6956

    More Details
  9. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  10. Alley, Parking & Sidewalk Restrictions on 7th St. between South & Columbia St. 5/1 to 6/1

    May 1, 2018, 6:00 AM - June 1, 2018, 5:00 PM

    Schwartz Painting will have alley, sidewalk & parking restrictions at 7th St. between South & Columbia St. (Central Presbyterian Church) for tuck pointing and cleaning the exterior of the church. Orange cones and signs will be in place to direct pedestrian traffic. Project will be from 5/1/18 to 6/1/18. Contact: Mike Schwartz 765-376-7037.

    More Details
  11. Moving Lane Restrictions on Salem St. from Union to Fannon Dr. 5/1 to 7/27 for curb & ramp repair

    May 1, 2018, 6:00 AM - July 27, 2018, 6:00 PM

    Dixon Construction will be having moving lane restrictions on Salem Street between Union Street and Fannon Drive, including Fannon Drive for the replacement of curb and handicap ramps. The closure will be from 5/1/18 to 7/27/18. Working hours will be from 6:00 AM to 6:00 PM. Watch for signage, barrels and flagmen. Contact: Tom Dixon 765-426-3501

    More Details

Main Calendar

  1. Board of Public Works Caucus Meeting

    May 1, 2018, 8:30 AM - 9:00 AM

    More Details
  2. Board of Public Works Meeting

    May 1, 2018, 9:00 AM - 10:00 AM @ Common Council Chamber