Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Lane Restrictions-US 52 South between Teal Rd & CR 775 E also Teal Rd from 30th St to US 52 S.

    April 2, 2018, 6:00 AM - September 8, 2018, 6:00 PM

    Rieth-Riley will be having numerous lane restrictions and closures throughout the project. Lane restrictions and closures will begin on Teal Rd. from S. 30th St. to US 52 S. They will continue at the intersection of Teal Rd. and US 52 S. heading South to the end of the project at CR 775 E. Contractor will be sending in updates throughout the project so that any modifications can be added to the road closure request, keeping it current. Traffic control will be in place at all times. Watch for flagmen, signage, barricades and barrels. Restrictions and closures will be from 4/2/18 to 9/8/18. Contact: Jeff Bond with Rieth-Riley 765-585-7758.

    More Details
  2. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  3. Bowen Eng. N. bound lane on Wabash Ave closed from 2000' N. of Old Romney Rd and Weaver St 7/16 to 8/27

    July 16, 2018, 7:00 AM - August 27, 2018, 5:00 PM

    Bowen Engineering will have a Lane Closure on Wabash Ave. from approx. 2000' North of Old Romney Road and ending at Weaver Street for the installation of a watermain. No Northbound traffic will be permitted past Lafayette Renew Offices. Closure will be from 7/16/18 to approx. 8/27/18. Watch for message boards and traffic control devices. Contact: Jared Weber 317-646-2064

    More Details
  4. Lane Restrictions on Elliott St from S. 9th St to S. 11th St 7/27 to 8/5 for curb/ramp replacement

    July 27, 2018, 8:00 AM - August 31, 2018, 5:00 PM

    Heartland Excavating will have road restriction on Elliott Street from S. 9th Street to S. 11th Street 7/27/18 to 8/31/18 for curb and ramp replacement. Watch for barrels. Contact: Mike Weathers 765-714-7686

    More Details
  5. Lane Shifts/Lane Restrictions on S. 4th St from Romig to Montifiore St 7/27 to 10/5 for curb/ramp replacement

    July 27, 2018, 8:00 AM - October 5, 2018, 5:00 PM

    Dixon Construction will have Lane Shifts and Lane Restrictions on S. 4th Street between Romig Street and Montifiore Street from 7/27/18 to 10/5/18 for curb and ramp replacement. Watch for signage, barrels. Contact: Tom Dixon 765-409-3489 or 765-426-3501

    More Details
  6. Temporary Alley and Sidewalk Closures Btwn Main & Columbia for Lahr Aparment Exterior Painting

    August 13, 2018 - September 14, 2018

    There will be periodic alley and sidewalk closures between Main and Columbia for painting at the Lahr Aparments. No work will be done during special events such as the Farmers Market, Mosey Down Main St., and Outfest. All sidewalks, alleys, and parking will be open during downtown events. The periodic closures will be for the remaining of August through mid September. For questions please contact Brian Cook (Renovia) at 317-407-1177 or bcook@renovia.com.

    More Details
  7. Sidewalk Closure - East Side of 3rd St from South to Alabama for Remodel to 301 South St

    August 16, 2018 - August 23, 2018

    The sidewalk on the east side of 3rd St from South to Alabama will be closed for demolition and installation of new storefront and install of new canopy. The closure will only be during working hours. Contact: Kirt Hunter (317) 618-6246 or by email at kirt.hunter@tonnandblank.com

    More Details
  8. Sidewalk Closure @ 313 Columbia St removing paint & tuck pointing masonry 8/17-8/31

    August 17, 2018, 8:00 AM - August 31, 2018, 6:00 PM

    Kennedy Homes will have the sidewalk closed at 313 Columbia Street from 8/17/18 to 8/31/18 to remove paint from brick and tuck pointing existing masonry.There will be a walk through scaffolding for the duration of the project. One parking space will be used to park boom lift. Contact: Ryan Kennedy 765-426-2604

    More Details
  9. Lane Restrictions on Salem, Fannon, Park, Calloway & Beech for milling & paving 8/22 - 8/29

    August 22, 2018, 6:00 AM - August 29, 2018, 6:00 PM

    Rieth-Riley will have lane restrictions on the following roads for milling and paving. They will be on Salem Street, Fannon Drive, Park Avenue, Calloway Street and Beech Drive from 8/22/18 to 8/29/18. The dates may need revised because of weather. Watch for flaggers, arrow boards, barrels and cones. Contact: Jeff Bond 765-585-7758

    More Details

Redevelopment Commission

  1. Redevelopment Commission Meetings

    August 23, 2018, 11:00 AM @ Board of Works Room

    More Details