  1. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  2. Lane Shifts/Lane Restrictions on S. 4th St from Romig to Montifiore St 7/27 to 10/5 for curb/ramp replacement

    July 27, 2018, 8:00 AM - October 5, 2018, 5:00 PM

    Dixon Construction will have Lane Shifts and Lane Restrictions on S. 4th Street between Romig Street and Montifiore Street from 7/27/18 to 10/5/18 for curb and ramp replacement. Watch for signage, barrels. Contact: Tom Dixon 765-409-3489 or 765-426-3501

    More Details
  3. Traffic pattern change on US 52 beginning 8/31/18 between CR 400 S & CR 800 S

    August 31, 2018, 7:00 AM - October 31, 2018, 5:00 PM

    Rieth-Riley will be changing the traffic pattern on US 52 from 8/31/18 to 10/31/18. Moving Eastbound lane into the original drive lane. Westbound driving lane will be moving through the crossovers into the Eastbound passing lane while maintaining two-way traffic. This change will take place between CR 400 S. and CR 800 S. Contact: J. R. Beaman 765-404-4750

    More Details
  4. Temporary Closure @ 16th & Franklin St. alley 9/12 - 10/1 for installation of gas main

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at 16th Street and Franklin Street alley for the installation of gas main. Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472.

    More Details
  5. Temporary closure @ alley between Adams & Central for installation of gas main 9/12-10/1

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at alley between Adams Street & Central Street 9/12/18 to 10/1/18 for the installation of gas main. Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472

    More Details
  6. Temporary Closure @ alley between Virginia & Adams 9/12-10/1 installation of gas main.

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at alley between Virginia and Adams Street 9/12/18 to 10/1/18 for installation of gas main.Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472

    More Details
  7. Main Street Closure -

    September 17, 2018, 12:15 PM - October 26, 2018

    Beginning monday September 17th the City will be closing Main Street to through traffic in between Kossuth Street and Perdue Street. construction work will be taking place at the intersection of 21st Street and Main Street and where Wallace Street and Congress Street intersect Main Street. There will be hard barricades at the following intersections, Perdue and Main, Wallace and Main, and 21st and Main, no traffic will be allowed past those points. This closure will be until approximately October 26th, 2018. The detour will be Kossuth Street, South 18th Street and Perdue Street.

    More Details
  8. Lane Restriction on Wabash Ave from Old Romney Rd to Alabama St 9/22 to 9/27 for milling & paving road

    September 22, 2018, 7:00 AM - September 27, 2018, 5:00 PM

    Rieth-Riley will have lane restrictions on Wabash Ave. from Old Romney Rd. to Alabama St. 9/22/18 to 9/27/18 to mill and pave roadway. Watch for flaggers. Contact: J R Beaman 765-404-4750

    More Details
  9. Lane Restriction on North St between 4th & 7th St from 9/24 to 9/26 locating utilities.

    September 24, 2018, 7:00 AM - September 26, 2018, 5:00 PM

    Accu-Dig will have lane restrictions on North Street between 4th Street and 7th Street from 9/24/18 to 9/26/18 to locate existing utilities in preperation for street work. There are 6 locations and the lane closure will move with each dig site. There will be a mini-excavator and vac-truck in use. Watch for cones, barricades and flaggers. Contact: Tracy Cunningham 574-583-4814 X4

    More Details
  10. Lane Restriction Westbound VMP (Northern most lane) @ Concord Rd. 9/24/18 for gas valve maintenance.

    September 24, 2018, 9:00 AM - 12:00 PM

    Vectren will have Lane Restrictions on Westbound VMP (Northern most lane) at Concord Road 9/24/18 for gas valve maintenance. Watch for signage and traffic cones. Contact: Jason Plantenga 765-714-6630.