Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Jump To:

  1. Calendar Overlay Engineering & Public Works (10)
  2. Calendar Overlay Main Calendar (1)

Engineering & Public Works

  1. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  2. Lane Shifts/Lane Restrictions on S. 4th St from Romig to Montifiore St 7/27 to 10/5 for curb/ramp replacement

    July 27, 2018, 8:00 AM - October 5, 2018, 5:00 PM

    Dixon Construction will have Lane Shifts and Lane Restrictions on S. 4th Street between Romig Street and Montifiore Street from 7/27/18 to 10/5/18 for curb and ramp replacement. Watch for signage, barrels. Contact: Tom Dixon 765-409-3489 or 765-426-3501

    More Details
  3. Traffic pattern change on US 52 beginning 8/31/18 between CR 400 S & CR 800 S

    August 31, 2018, 7:00 AM - October 31, 2018, 5:00 PM

    Rieth-Riley will be changing the traffic pattern on US 52 from 8/31/18 to 10/31/18. Moving Eastbound lane into the original drive lane. Westbound driving lane will be moving through the crossovers into the Eastbound passing lane while maintaining two-way traffic. This change will take place between CR 400 S. and CR 800 S. Contact: J. R. Beaman 765-404-4750

    More Details
  4. Temporary Closure @ 16th & Franklin St. alley 9/12 - 10/1 for installation of gas main

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at 16th Street and Franklin Street alley for the installation of gas main. Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472.

    More Details
  5. Temporary closure @ alley between Adams & Central for installation of gas main 9/12-10/1

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at alley between Adams Street & Central Street 9/12/18 to 10/1/18 for the installation of gas main. Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472

    More Details
  6. Temporary Closure @ alley between Virginia & Adams 9/12-10/1 installation of gas main.

    September 12, 2018, 7:00 AM - October 1, 2018, 5:00 PM

    Patton Construction will have temporary closure at alley between Virginia and Adams Street 9/12/18 to 10/1/18 for installation of gas main.Watch for flaggers and signage. Contact: Dave Johnson 765-543-5472

    More Details
  7. Main Street Closure -

    September 17, 2018, 12:15 PM - October 26, 2018

    Beginning monday September 17th the City will be closing Main Street to through traffic in between Kossuth Street and Perdue Street. construction work will be taking place at the intersection of 21st Street and Main Street and where Wallace Street and Congress Street intersect Main Street. There will be hard barricades at the following intersections, Perdue and Main, Wallace and Main, and 21st and Main, no traffic will be allowed past those points. This closure will be until approximately October 26th, 2018. The detour will be Kossuth Street, South 18th Street and Perdue Street.

    More Details
  8. Sidewalk Closure @ 301 South St 9/28 to 10/12 remove & replace sidewalk & ramp.

    September 28, 2018, 7:00 AM - October 12, 2018, 5:00 PM

    Tonn and Blank Construction will have sidewalk closed at 301 South Street from 9/28/18 to 10/12/18 for removal and replace of sidewalk and ramp. Ther will also be parking spots as well closed off for dumpster. There will be ADA compliant signage and barricades. They will also have fencing around construction site. Contact: Kirt Hunter 317-618-6246

    More Details
  9. FARMERS MARKET

    September 29, 2018, 5:00 AM - 1:00 PM

    Road Closure on 5th St. between Main St. & Columbia St. for the Farmers Market. Closure will be from 5:00 AM to 1:00 PM. Farmers Market takes place May to October every Saturday. Contact: Emily Colombo 765-742-4044.

    More Details
  10. Parking Restricted along 3rd St. on West side of Courthouse 9/29/18 from 7AM-11AM

    September 29, 2018, 7:00 AM - 11:00 AM

    Bellinger's Tree Care will have parking space restrictions on the West side of the Tippecanoe County Courthouse to place a crane for removal of two trees on 9/29/18 from 7:00 AM to 11:00 AM. Contact: Jeff Freel 765-413-4237

    More Details

Main Calendar

  1. Inaugural Oktoberfest Brokerage Brewing Company

    September 27, 2018, 5:00 PM - September 30, 2018, 8:00 PM @ Brokerage Brewing Company

    4 Day Tent Party @ Brokerage Brewing Company Thursday, Sept 27th - Sunday, Sept 30th THURSDAY: Live Music by Greg Jones FRIDAY: One Size Fits All Improv Comedy SATURDAY: Pop-Up Market Beer Yoga with Anita Trent from Be Moved Power Yoga Tippecanoe Homebrewers' Circle & Tippie Tasters Showcase Live Music by Wunderlick SUNDAY: Live Music by The Riverboat Ramblers River Rat Ride Pub Theology Beer & Hymns Food Trucks Every Day! EMTfoodtruck, Rtb Chefs, Smolder BBQ, The Guac Box, L Kora Fast, Tick Tock Catering and Food Truck, & Trap House Tacos Cover: $5 *cover charged after 7pm on Friday & Saturday $10 souvenir glass NOW AVAILABLE (while supplies last) 21+ only #BBCoFest

    More Details