Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

City Council

  1. City Council Caucus Meeting

    May 29, 2019, 6:30 PM - 7:30 PM @ Board of Works Room

    More Details

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  3. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  4. 3 Parking Spaces Closed-S. side Main St between 3rd & 4th St on the East end 5/6-9/20 for Courthouse renovation

    May 6, 2019, 7:00 AM - September 20, 2019, 5:00 PM

    Tecton will have 3 parking spaces closed off for a dumpster for Tippecanoe County Courthouse Renovations. This will be on the South side of Main Street between 3rd Street and 4th Street at 4th Street. A dumpster with cones will be placed in the closed off parking spaces. Contact: Nathan Wireman 219-393-0113

    More Details
  5. Road Closure @ intersection of N. 5th & North St. 5/13 - 6/17 for road construction

    May 13, 2019, 7:00 AM - June 17, 2019

    Rieth-Riley will have a road closure at the intersection of N. 5th Street and North Street from 5/13/19 to 6/17/19 for road construction. Watch for road closed and detour signage and traffic control devices. Contact: Mike Rominger 765-656-4612

    More Details
  6. Periodic lane closures on Union , 12th & 13th from 5/20-6/28 doing construction on Union Place Apts.

    May 20, 2019, 7:00 AM - June 28, 2019, 7:00 PM

    Keller Development will have periodic lane closures from 7:00 am to 7:00 pm on 5/20/19 to 6/28/19 on the North lane of Union Street between 12th Street and 13th Street. East lane of 12th Street between Union Street and Salem Street and West lane of 13th Street between Union Street and Salem Street. This will be for moving equipment and supplies to finish construction of the building. Watch for barrels and traffic control and signage. Contact: Mark Snyder 260-348-1976

    More Details
  7. Road Closure on Main St between 11th St & 12 St 5/20-7/12 for drainage improvements

    May 20, 2019, 7:00 AM - July 12, 2019, 5:00 PM

    Bowen Engineering will have Main Street Closed from N. 11th Street to N. 12th Street (including intersection) from 5/20/19 to 7/12/19 for street drainage improvements. Watch for flagmen, maintenance of traffic signage to detour vehicular traffic as well as sidewalk detours for pedestrian traffic. Contact: Nick Isenhower 317-518-9721

    More Details