Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Road Closure-Wallace St 10/29/18 to 5/24/19 for Loeb Stadium watermain installation

    October 29, 2018, 7:00 AM - May 24, 2019, 5:00 PM

    Bowen Engineering will have Wallace Ave. and 24th St. shut down from 10/29/18 to 5/24/19. The intersection of Brice St. and 24th St. will be shut down for the majority of the project. There will be approx. a 3-4 week period when Brice St. between 24th St. and Park Ave. will be shut down to all traffic. Watch for lots of heavy equipment. Watch for Directional Signage, Detour signage, Road Closed signage, barricades, barrels and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  3. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  4. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  5. Lane Closure North lane of Union St between 12th & 13th St 4/18-5/18 working on apt. bldg.

    April 18, 2019, 7:00 AM - May 18, 2019, 5:00 PM

    Keller Development will have the North Lane of Union Street between 12th Street and 13th Street from 4/18/19 to 5/18/19 to work on the front of apartment building that is being constructed (Union Place Apts.) Watch for arrow board, signs and barrels. North lane will taper into the South lane between 12th Street and 13th Street. Contact: Mark Snyder 260-348-1976

    More Details
  6. Lane Restriction @ 3601 Union St Eastbound lane closest to shoulder 4/22-5/17 for installation of curb

    April 22, 2019, 7:00 AM - May 17, 2019, 5:00 PM

    RW Contracting will have a temporary lane restriction at 3601 Union Street from 4/22/19 to 5/17/19 for installation of curb and sidewalk. This will be along the South shoulder of the Eastbound lane. Watch for signage and barrels. There will be sidewalk closed signs at Union Street and Shenandoah Drive, also at Union Street and 36th Street. Contact: Matthew Miller 765-499-9390

    More Details
  7. Road Closure-North St from 6th to 7th St 5/3-5/17 for installation of gas line

    May 3, 2019, 7:00 AM - May 17, 2019, 5:00 PM

    Miller Pipe Line will have a road closure on North Street between 6th Street and 7th Street from 5/3/19 to 5/17/19 for gas line installation. Watch for traffic control devices. Contact: Shane Leadman 317-517-1613

    More Details
  8. 3 Parking Spaces Closed-S. side Main St between 3rd & 4th St on the East end 5/6-9/20 for Courthouse renovation

    May 6, 2019, 7:00 AM - September 20, 2019, 5:00 PM

    Tecton will have 3 parking spaces closed off for a dumpster for Tippecanoe County Courthouse Renovations. This will be on the South side of Main Street between 3rd Street and 4th Street at 4th Street. A dumpster with cones will be placed in the closed off parking spaces. Contact: Nathan Wireman 219-393-0113

    More Details
  9. Road Closure-Intersection of N. 4th St & North St 5/6-5/9 for road construction

    May 6, 2019, 7:00 AM - May 9, 2019, 5:00 PM

    Rieth-Riley will have the intersection of N. 4th Street and North Street closed from 5/6/19 to 5/9/19 (depending on weather) for road construction. Watch signage for detours and closed roads. Contact: Mike Rominger 765-656-4612

    More Details
  10. Lane Restrictions Northbound N. 13th St. @ Salem 5/9-5/18 updating equipment

    May 9, 2019, 7:00 AM - May 18, 2019, 5:00 PM

    Duke Energy will have lane restrictions on Northbound N. 13th Street at Salem Street. They will be updating equipment from 5/9/19 to 5/18/19 during the working hours of 7:00 AM to 5:00 PM. This is all weather permitting. Contact: Kirk Underhill 765-446-4004

    More Details