Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  3. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  4. 3 Parking Spaces Closed-S. side Main St between 3rd & 4th St on the East end 5/6-9/20 for Courthouse renovation

    May 6, 2019, 7:00 AM - September 20, 2019, 5:00 PM

    Tecton will have 3 parking spaces closed off for a dumpster for Tippecanoe County Courthouse Renovations. This will be on the South side of Main Street between 3rd Street and 4th Street at 4th Street. A dumpster with cones will be placed in the closed off parking spaces. Contact: Nathan Wireman 219-393-0113

    More Details
  5. Moving Road Closure-Vinton St., Longlois Dr. & 29th St. 6/10-10/25 WaterMain Replacement

    June 10, 2019, 7:00 AM - October 25, 2019, 5:00 PM

    TSW Utilities will be having moving road closures in the Vinton Subdivision. The following roads will have limited access, local traffic only: Vinton Street from Elmwood Ave. to Longlois Dr., Longlois Drive (South end) from Elmwood Ave. to Elmwood Ave., 29th Street from Longlois Dr. to Vinton St., Prairie Lane will have temporary road closure. Watch for Road Construction Ahead and Road Closed Ahead signs and Local Traffic Only signs. Contact: Terry Ratliff 317-354-5111

    More Details
  6. Lane Closure-Northbound 4th St from Owen to Kossuth St 6/12-7/30 to install new water main

    June 12, 2019, 7:00 AM - July 30, 2019, 5:00 PM

    Atlas Excavating will have a Northbound lane closure on S. 4th Street between Kossuth Street and Owen Street for the installation of a new water main. This will be 6/12/19 to 7/30/19. Watch for Traffic Signage (Detour and Road Closed Signs) as well as Message Boards. Southbound may have temporary closures in non-rush hours. Flaggers will be used for these occasions. This will be the first phase of road closures. There will be more information coming as the project moves along S. 4th Street between Montifiore Street and Saw Mill Run. Contact: Keith O'Brien 765-479-0847

    More Details
  7. Sidewalk Closed Indefinitely on East side of South St between Main St & 18th Street

    June 13, 2019, 3:00 PM - December 31, 2019, 5:00 PM

    The sidewalk on the East side of South Street between Main Street and 18th Street has been closed Indefinitely. Contact: Mark Gick 765-807-1050

    More Details
  8. Road Closure @ intersection of Kimberly Dr & Kensington Dr 6/24 - 8/12 for storm sewer & new curb

    June 24, 2019, 7:00 AM - August 12, 2019, 5:00 PM

    Kettlehut Construction will have the intersection of Kimberly Dr. and Kensington Dr. completely closed for the installation of a new storm structure and piping below the street. This will be 6/24/19 to 8/12/19. Once the storm sewer work is complete and the roadway patched, Kimberly Dr. and Kensington Dr. will both be one lane traffic where they are adjacent to Glen Acres Elementary School, so that the new curb and sidewalk can be installed. Watch for Detour, Road Closed and Direction Signage. Contact: Nate Seacrest 765-447-2181

    More Details
  9. Road Closure on North St between 5th St & 7th St for road construction 6/24 - 8/31

    June 24, 2019, 7:00 AM - August 31, 2019, 5:00 PM

    Rieth-Riley will have North Street closed from 5th Street to 7th Street for road construction. The 6th Street intersection will be closed. This will be from 6/24/19 to 8/31/19. Watch for Detour, Road Closed and Direction Signage. Contract: Mike Rominger 765-656-4612

    More Details
  10. Road Closure on 10th St from Columbia to South St 7/8 to 8/16 for road construction

    July 8, 2019, 7:00 AM - August 16, 2019, 5:00 PM

    Bowen Engineering will have a road closure on 10th Street between Columbia Street and South Street from 7/8/19 to 8/16/19 for road construction. Watch for signage, traffic control devices and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  11. Road Closure @ 9th St. and Fannon Dr. for construction 7/15 - 7/28

    July 15, 2019, 7:00 AM - July 28, 2019, 5:00 PM

    Bowen Engineering will have a road closure at 9th Street and Fannon Drive intersection from 7/15/19 to 7/28/19 for construction. Watch for road closed and detour signs. Contact: Scott Heinzelman 317-719-2767

    More Details
  12. Road Closure on Canal Rd @ Marion St for construction 7/15 - 7/28

    July 15, 2019, 7:00 AM - July 28, 2019

    Bowen Engineering will have a road closure on Canal Rd. at Marion St. for construction work from 7/15/19 to 7/28/19. Watch for road closed signs, detour signs and traffic control devices. Contact: Scott Heinzelman 317-719-2767

    More Details
  13. Sidewalk Closures Rennaissance Place N. 2nd & Main painting balconies 7/15-8/31 using lift

    July 15, 2019, 7:00 AM - August 31, 2019, 5:00 PM

    Precise painting will have sidewalk closures on 2nd St. between Ferry St. and Main St. and on Main St. between 2nd St. and 3rd St. on 7/15/19 to 8/31/19 to paint balconies. There will be a lift on site. Sidewalk Closed signs will be in place as well as Caution tape, cones, etc. Contact: Shannon Rhode 765-412-6459

    More Details
  14. Kossuth Street Sidewalk Closure

    July 19, 2019 - July 31, 2019

    Sidewalk along North side of Kossuth Street from 26th to Park Avenue will be closed for building demolition from 7-19-19 to 7-31-19. Contact: Demetrius Knop 765-404-3465 Knop Excavating

    More Details
  15. Road Closure on Hartford Street from 14th to 15th St 7/23 to 12/31 for Demo

    July 23, 2019, 7:00 AM - December 31, 2019, 5:00 PM

    Denney Excavating will have Hartford Street closed between 14th Street and 15th Street for the demolition of St. Francis Lafayette Hospital West and North wings and the St. Elizabeth Nursing School. Watch for road closed and detour signage. Contact: Suzanne Borges 317-554-2812

    More Details
  16. Lane Restrictions on South St from Main St to 18th St 7/24 to 9/30

    July 24, 2019, 7:00 AM - September 30, 2019, 5:00 PM

    Watch for Lane Restriction and Lane Shifts on South Street from Main Street to 18th Street. On South Street traveling West there will be no left turns. This is in preparation for demolition of building at the corner of Main Street and South Street. Watch for signage and traffic control devices. Contact: Mark Gick 765-479-3517

    More Details
  17. Sidewalk closure for the new PEFCU bldg at 4th & Main for lift for painting windows 7/24-8/23

    July 24, 2019, 7:00 AM - August 23, 2019, 5:00 PM

    Schwartz Painting will have the following sidewalk restrictions for painting windows at the new PEFCU building at 4th Street and Main Street. South sidewalk, East sidewalk and West side alley. During the week there will be a lift parked in one parking space over night. During the weekend it will be moved to a parking lot. This will be from 7/24/19 to 8/23/19. Contact: Michael Schwatrz 765-376-7037

    More Details
  18. Road Closure to through traffic on Vinton St from 29th St to Elmwood 7/26-8/2 water main replacement

    July 26, 2019, 7:00 AM - August 2, 2019, 5:00 PM

    TSW will have Vinton Street closed to through traffic from 29th Street to Elmwood Avenue, including the intersection of 29th Street and Vinton Street 7/26/19 to 8/2/19 during the hours of 7:30 am to 6:00 pm for water main replacement work. The road will be open Saturday and Sunday. Contact: Terry Ratliff 317-345-5111

    More Details
  19. Sidewalk and parking Restriction SE corner of 4th & Main St 7/26 - 7/28 for roofing.

    July 26, 2019, 7:00 AM - July 28, 2019, 5:00 PM

    Diversified roofing will have sidewalk and parking space restrictions at the SE corner of 4th Street and Main Street 7/26/19 to 7/28/19. They will be re-roofing Lafayette Business Tower. Contact: Mike Hutchings 317-775-3514

    More Details
  20. Temporary Road Closure @ 2230 Charles St between 22nd & 24th St 7/26-7/28 for tree removal

    July 26, 2019, 7:00 AM - July 28, 2019, 5:00 PM

    Temporary Road Closure at 2230 Charles Street between 22nd Street and 24th Street 7/26/19 to 7/28/19 to remove a tree. Emergency vehicles will have access. Watch for cones, caution tape. Contact: Marcia DelReal 765-426-9081

    More Details
  21. UPDATE: (Northbound 4th Street temporarily closed at Teal Road Intersection - Expect closure to last 2 weeks) Lane Closure Northbound lane of 4th St from 1850 S. 4th St to Club Ln intersection 7/27-11/7

    July 27, 2019, 7:00 AM - November 7, 2019, 5:00 PM

    UPDATE: Northbound lane of 4th Street will be temporarily closed from Teal Road to Club Lane. Please follow the traffic signs and detours to access businesses in this area. The northbound lane of 4th St. will re-open to 1850 S 4th Street once the work in this area is complete. Atlas Excavating will have the Northbound lane of 4th Street from 1850 S. 4th Street to Club Lane Closed 7/27/19 to 11/7/19 for water main replacement work. Watch for detour, road closed signage. Watch for heavy equipment. Contact: Bret Dierdorf 765-637-9124

    More Details
  22. Star City Blues & Jazz Festival downtown Lafayette 7/27 from 5 pm to 12 am

    July 27, 2019, 5:00 PM - July 28, 2019, 12:00 AM

    Friend of Downtown will be hosting the Star City Blues and Jazz Festival on 7/27/19 from 5:00 pm to 7/28/19 at 12:00am. Look for the following road closures. 5th Street between Main Street and Columbia Street, Main Street between 5th Street and alley between 4th Street and 5th Street. Watch for barricades. Contact: Ken McCammon 765-714-4844.

    More Details
  23. 4th Street Lane & Sidewalk Closure

    July 28, 2019, 8:00 AM - 10:30 AM

    The eastern most North bound lane and adjacent sidewalk of 4th Street will be closed between South & Columbia for equipment Sunday July 28th from 8:00 AM to 10:30 AM. Watch for cones and signs and use caution in the area. Contact: Leo Pineda 765-742-5070 Star Cleaning

    More Details