  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  3. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  4. 3 Parking Spaces Closed-S. side Main St between 3rd & 4th St on the East end 5/6-9/20 for Courthouse renovation

    May 6, 2019, 7:00 AM - September 20, 2019, 5:00 PM

    Tecton will have 3 parking spaces closed off for a dumpster for Tippecanoe County Courthouse Renovations. This will be on the South side of Main Street between 3rd Street and 4th Street at 4th Street. A dumpster with cones will be placed in the closed off parking spaces. Contact: Nathan Wireman 219-393-0113

    More Details
  5. Moving Road Closure-Vinton St., Longlois Dr. & 29th St. 6/10-10/25 WaterMain Replacement

    June 10, 2019, 7:00 AM - October 25, 2019, 5:00 PM

    TSW Utilities will be having moving road closures in the Vinton Subdivision. The following roads will have limited access, local traffic only: Vinton Street from Elmwood Ave. to Longlois Dr., Longlois Drive (South end) from Elmwood Ave. to Elmwood Ave., 29th Street from Longlois Dr. to Vinton St., Prairie Lane will have temporary road closure. Watch for Road Construction Ahead and Road Closed Ahead signs and Local Traffic Only signs. Contact: Terry Ratliff 317-354-5111

    More Details
  6. Sidewalk Closed Indefinitely on East side of South St between Main St & 18th Street

    June 13, 2019, 3:00 PM - December 31, 2019, 5:00 PM

    The sidewalk on the East side of South Street between Main Street and 18th Street has been closed Indefinitely. Contact: Mark Gick 765-807-1050

    More Details
  7. Road Closure @ intersection of Kimberly Dr & Kensington Dr 6/24 - 8/12 for storm sewer & new curb

    June 24, 2019, 7:00 AM - August 12, 2019, 5:00 PM

    Kettlehut Construction will have the intersection of Kimberly Dr. and Kensington Dr. completely closed for the installation of a new storm structure and piping below the street. This will be 6/24/19 to 8/12/19. Once the storm sewer work is complete and the roadway patched, Kimberly Dr. and Kensington Dr. will both be one lane traffic where they are adjacent to Glen Acres Elementary School, so that the new curb and sidewalk can be installed. Watch for Detour, Road Closed and Direction Signage. Contact: Nate Seacrest 765-447-2181

    More Details
  8. Road Closure on North St between 5th St & 7th St for road construction 6/24 - 8/31

    June 24, 2019, 7:00 AM - August 31, 2019, 5:00 PM

    Rieth-Riley will have North Street closed from 5th Street to 7th Street for road construction. The 6th Street intersection will be closed. This will be from 6/24/19 to 8/31/19. Watch for Detour, Road Closed and Direction Signage. Contract: Mike Rominger 765-656-4612

    More Details
  9. Road Closure on 10th St from Columbia to South St 7/8 to 8/16 for road construction

    July 8, 2019, 7:00 AM - August 16, 2019, 5:00 PM

    Bowen Engineering will have a road closure on 10th Street between Columbia Street and South Street from 7/8/19 to 8/16/19 for road construction. Watch for signage, traffic control devices and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  10. Sidewalk Closures Rennaissance Place N. 2nd & Main painting balconies 7/15-8/31 using lift

    July 15, 2019, 7:00 AM - August 31, 2019, 5:00 PM

    Precise painting will have sidewalk closures on 2nd St. between Ferry St. and Main St. and on Main St. between 2nd St. and 3rd St. on 7/15/19 to 8/31/19 to paint balconies. There will be a lift on site. Sidewalk Closed signs will be in place as well as Caution tape, cones, etc. Contact: Shannon Rhode 765-412-6459

    More Details
  11. Road Closure on Hartford Street from 14th to 15th St 7/23 to 12/31 for Demo

    July 23, 2019, 7:00 AM - December 31, 2019, 5:00 PM

    Denney Excavating will have Hartford Street closed between 14th Street and 15th Street for the demolition of St. Francis Lafayette Hospital West and North wings and the St. Elizabeth Nursing School. Watch for road closed and detour signage. Contact: Suzanne Borges 317-554-2812

    More Details
  12. Lane Restrictions on South St from Main St to 18th St 7/24 to 9/30

    July 24, 2019, 7:00 AM - September 30, 2019, 5:00 PM

    Watch for Lane Restriction and Lane Shifts on South Street from Main Street to 18th Street. On South Street traveling West there will be no left turns. This is in preparation for demolition of building at the corner of Main Street and South Street. Watch for signage and traffic control devices. Contact: Mark Gick 765-479-3517

    More Details
  13. Sidewalk closure for the new PEFCU bldg at 4th & Main for lift for painting windows 7/24-8/23

    July 24, 2019, 7:00 AM - August 23, 2019, 5:00 PM

    Schwartz Painting will have the following sidewalk restrictions for painting windows at the new PEFCU building at 4th Street and Main Street. South sidewalk, East sidewalk and West side alley. During the week there will be a lift parked in one parking space over night. During the weekend it will be moved to a parking lot. This will be from 7/24/19 to 8/23/19. Contact: Michael Schwatrz 765-376-7037

    More Details
  14. UPDATE: (Northbound 4th Street temporarily closed at Teal Road Intersection - Expect closure to last 2 weeks) Lane Closure Northbound lane of 4th St from 1850 S. 4th St to Club Ln intersection 7/27-11/7

    July 27, 2019, 7:00 AM - November 7, 2019, 5:00 PM

    UPDATE: Northbound lane of 4th Street will be temporarily closed from Teal Road to Club Lane. Please follow the traffic signs and detours to access businesses in this area. The northbound lane of 4th St. will re-open to 1850 S 4th Street once the work in this area is complete. Atlas Excavating will have the Northbound lane of 4th Street from 1850 S. 4th Street to Club Lane Closed 7/27/19 to 11/7/19 for water main replacement work. Watch for detour, road closed signage. Watch for heavy equipment. Contact: Bret Dierdorf 765-637-9124

    More Details
  15. Temporary Lane Restriction on Creasy Ln from Creasy Ct to I-65 from 8/8 - 8/30

    August 8, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Lineal Contracting will have a lane restriction on Creasy Ln. between Creasy Ct. and I-65 from 8/8/19 to 8/30/19 for ATT fiber installation. Watch for Flaggers, arrow boards, signs and cones. Contact: Carl Duncan 812-583-4103

    More Details
  16. Lane Shift on N. 5th St. between South & Columbia 8/10 - 8/12 pouring concrete

    August 10, 2019, 7:00 AM - August 12, 2019, 2:00 PM

    Star City Crossing will have a lane shift on N. 5th Street between South Street and Columbia Street 8/10/19 to 8/12/19 from 7:00 am to 2:00 pm to pour concrete. Watch for traffic control signage and flaggers. Contact: Jon Caron 765-414-3995

    More Details
  17. Mosey Down Main Street-Road Closure of Main between 6th & 11th from 3PM-1AM

    August 10, 2019, 3:00 PM - August 11, 2019, 1:00 AM

    Mosey Down Main Street will have Road Closures on Main Street between 6th Street and 11th Street as well as 9th Street between Columbia Street and Ferry Street. This will be on Saturday 8/10/19 from 3:00 PM to 1:00 AM. Contact: Ken McCammon 765-714-4844