August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM
Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace2019-08-15T07:00:00J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
Event LocationLafayetteIN47901 J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
More Details
-
October 15, 2019, 7:00 AM - August 16, 2020, 5:00 PM
Lane Closures on Eastbound lanes 2100' N. Schuyler Ave. 10/15/19-8/16/20 water & sewer project2019-10-15T07:00:00Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
Event LocationLafayetteIN47901 Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
More Details
-
November 13, 2019, 7:00 AM - August 31, 2020, 5:00 PM
Sidewalk & parking closure also alley closure @ 1007 Main St 11/13/19-8/31/20 for construction of restaurant2019-11-13T07:00:00Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472
Event LocationLafayetteIN47901 Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472
More Details
-
April 6, 2020 - July 15, 2020
Lane closure - Twyckenham Blvd2020-04-06T00:00:00Milestone will be closing Twyckenham Blvd to Eastbound traffic between Poland Hill Rd and 9th Street on April 6th. West Bound traffic will be allowed thru traffic to give access to all businesses and residents along Twyckenham Blvd.
Contact: Joe Ratcliff 765-427-4416 Milestone Contractors
Event LocationTwyckenham BlvdLafayetteIN47901 Milestone will be closing Twyckenham Blvd to Eastbound traffic between Poland Hill Rd and 9th Street on April 6th. West Bound traffic will be allowed thru traffic to give access to all businesses and residents along Twyckenham Blvd.
Contact: Joe Ratcliff 765-427-4416 Milestone Contractors
More Details
-
April 23, 2020 - July 10, 2020
Longlois Dr Lane Restrictions2020-04-23T00:00:00Longlois Drive will have restricted lanes from 4/23/2020 to 7/10/2020 between North 29th Street and Vinton Street for curb & sidewalk replacement.
Contact: Tom Dixon 765-474-2186
Event Location3212 Longlois DrLafayetteIN47901 Longlois Drive will have restricted lanes from 4/23/2020 to 7/10/2020 between North 29th Street and Vinton Street for curb & sidewalk replacement.
Contact: Tom Dixon 765-474-2186
More Details
-
April 27, 2020 - June 22, 2020
10th Street Closure2020-04-27T00:00:00Rieth Riley will have 10th Street closed from Ferry Street to Main Street starting April 27th and ending June 22nd. The closure is for City of Lafayette Streetscape project.
Contact: Mike Rominger 765-656-4612 Rieth Riley
Event Location215 N 10thLafayetteIN47901 Rieth Riley will have 10th Street closed from Ferry Street to Main Street starting April 27th and ending June 22nd. The closure is for City of Lafayette Streetscape project.
Contact: Mike Rominger 765-656-4612 Rieth Riley
More Details
-
May 20, 2020 - July 24, 2020
Greenbriar Subdivision2020-05-20T00:00:00Heartland Excavating will be working on storm inlets and ADA ramps in Greenbriar Subdivision from 5-2-2020 to 7-24-2020. There will be small areas where traffic will be affected but no closures.
Contact: Mike Weathers 765-714-7686
Event Location2130 Vancouver DrLafayetteIN47901 Heartland Excavating will be working on storm inlets and ADA ramps in Greenbriar Subdivision from 5-2-2020 to 7-24-2020. There will be small areas where traffic will be affected but no closures.
Contact: Mike Weathers 765-714-7686
More Details
-
June 4, 2020, 12:00 PM - June 5, 2020, 3:00 PM
4th Street Lane Restriction2020-06-04T12:00:00Integrate Build will have the southbound lane of South 4th Street closed at the 200 block for unloading structural steel. The closure will be from 12:00 pm to 3:00 pm Thursday June 4th and 6:00 am to 3:00 pm Friday June 5th.
Contact: Kyle Sorenson 765-426-2892 Integrate Build
Event Location200 S 4th StreetLafayetteIN47901 Integrate Build will have the southbound lane of South 4th Street closed at the 200 block for unloading structural steel. The closure will be from 12:00 pm to 3:00 pm Thursday June 4th and 6:00 am to 3:00 pm Friday June 5th.
Contact: Kyle Sorenson 765-426-2892 Integrate Build
More Details
-
June 5, 2020, 9:00 AM
Temporary Closure on 4th St. from Romig to Fountain due to accident. 2020-06-05T09:00:00A temporary road closure is in place on 4th Street from Romig to Fountain due to an accident. Please avoid the area and use alternative routes until the area is cleared.
For questions, please contact the Lafayette Police Department at 765-807-1200.
Event Location402 Romig StLafayetteIN47901 A temporary road closure is in place on 4th Street from Romig to Fountain due to an accident. Please avoid the area and use alternative routes until the area is cleared.
For questions, please contact the Lafayette Police Department at 765-807-1200.
More Details