  1. Driving lane, parking & sidewalk closures for the Ellsworth Project construction 12/28/20 to 7/29/22

    December 28, 2020, 7:00 AM - July 29, 2022, 5:00 PM

    Construction of the Ellsworth Project, closures for construction, deliveries, hoisting and trash removal from 12/28/20 to 7/29/22. Closure locations: South Street sidewalk and parking from 4th Street to 5th Street; 5th Street Southbound lane and sidewalk; Alabama Street Westbound lane and sidewalk. Detail summary of closures: Installing jersey barriers with chain link fence on top of barriers, closing off parking and sidewalk on the South side of South Street from the entry into Regions Bank parking lot, East to 5th Street; then the Southbound lane and sidewalk on 5th Street from South Street to Alabama Street; then the Westbound lane and sidewalk on Alabama Street from 5th Street to 4th Street. Watch for Construction/Closure/Detour signage and traffic control devices throughout the construction of the project. Contact: Bruce Pauley Phone: 317-750-3594 email: bpauley@rigdonconstruction.com>

    More Details
  2. Sidewalk closed during new building construction at 631 Main Street from 1/26/21 to 5/30/22.

    January 26, 2021, 7:00 AM - May 30, 2022, 5:00 PM

    Sidewalk closure at 631 Main Street from 1/26/21 to 5/30/22 for new building construction. There is a fence that serves as a safety barrier and sidewalk closed signs in place. Contact: Tim O'Bryan Phone: 765-427-9213 email: tobryan@mcon2.com

    More Details
  3. Public Safety Bldg. traffic control, 601 Columbia St. between 6th & 7th St. 5/8/21-1/5/23

    May 8, 2021, 7:00 AM - January 5, 2023, 5:00 PM

    Public Safety Building and Garage Project traffic control, 601 Columbia Street between 6th Street and 7th Street. 6th Street between Columbia Street and South Street will be closed to all traffic except police. 7th Street between Columbia Street and South Street, one-way Northbound. Columbia Street between 6th Street and 7th Street, no short-term parking either side of road. Contact: Tom Morlan Phone: 765-447-2181 email: tpm@kettelhut.com

    More Details
  4. Closure - Sagamore Pkwy

    January 7, 2022, 8:00 AM - February 7, 2022, 5:00 PM
    @

    From January 7, to February 7, there will be a single lane closure on Sagamore Pkwy between Teal Rd and Greenbush St, and on Greenbush St from Sagamore Pkwy to 3395 Greenbush St to allow for directional boring for Duke Energy.

    There will be flagging signs, cones, and arrow boards to alert traffic. Drilling will attempt to be off the road as much as possible.

    For further information and inquiries, please contact Brad Young at 513-476-8014 or brad.young@primetechusa.com

    From January 7, to February 7, there will be a single lane closure on Sagamore Pkwy between Teal Rd and Greenbush St, and on Greenbush St from Sagamore Pkwy to 3395 Greenbush St to allow for directional boring for Duke Energy. There will be flagging signs, cones, and arrow boards to alert traffic. Drilling will attempt to be off the road as much as possible. For further information and inquiries, please contact Brad Young at 513-476-8014 or brad.young@primetechusa.com

    More Details
  5. Closure - 108 Lincoln St

    January 10, 2022, 8:00 AM - January 14, 2022, 5:00 PM
    @

    There will be a partial closure of the lane at 108 Lincoln St to repair a sewer line. A 16-20 ft section of the street will be removed to allow access. Flaggers and cones will be used to direct traffic past the area. This will not be a complete closure.

    For further information and inquiries, please contact Cynthia Bandy at 317-743-8893 or permits@petermanhvac.com

    There will be a partial closure of the lane at 108 Lincoln St to repair a sewer line. A 16-20 ft section of the street will be removed to allow access. Flaggers and cones will be used to direct traffic past the area. This will not be a complete closure. For further information and inquiries, please contact Cynthia Bandy at 317-743-8893 or permits@petermanhvac.com

    More Details
  6. Closure - Eastland Dr. (DATES UPDATED)

    January 10, 2022, 8:00 AM - January 14, 2022, 5:00 PM
    @

    From December 27th to December 31st, the East lane of Eastland Dr. will be closed due to construction on a water main hook up, from South St to Grace Ln.

    A backhoe will be on site, and signage for road closure as well as marking cones will be present to alert traffic.

    For further inquiries and information, please contact Luke Kline at 217-821-0269 or luke@drakeexcavating.com

    More Details
  7. Closure - Park East Blvd (Lane and Sidewalk) - DATES UPDATED

    January 10, 2022, 8:00 AM - January 19, 2022, 5:00 PM
    @

    From January 10 to January 19, the West lane of South bound traffic and sidewalk of Park East Blvd will be coned off before the work area due to electrical utility work being performed. 

    The 2nd South bound lane will remain open. Numerous signs will be posted before the cones are set up to alert traffic. 

    For further information and inquiries, please contact Luke Bontrager at 765-269-4869 or lbontrager@tipmont.org

    From January 17 to January 20, the West lane of South bound traffic and sidewalk of Park East Blvd will be coned off before the work area due to electrical utility work being performed. The 2nd South bound lane will remain open. Numerous signs will be posted before the cones are set up to alert traffic. For further information and inquiries, please contact Luke Bontrager at 765-269-4869 or lbontrager@tipmont.org

    More Details