SlideShow

  • Newly paved South Street
  • New asphalt on South Street
  • A view looking east on South Street showing curb work in the distance
  • Sidewalk corner and ramp on South Street ready to be poured
  • Construction work on a corner of a South Street intersection
  • Newly poured corner on South Street
  • Making controlled cuts in curbs along Sagamore Parkway
  • A construction worker inspecting a drainage trench on Sagamore Parkway
  • Pouring new curbs on Sagamore Parkway
  • New lanes, sidewalk, curbs, ramps, and landscaping on Sagamore Parkway
  • Completed lanes on Sagamore Parkway
  • New curbs Sagamore Parkway at Kossuth Street
  • New curbs on Sagamore Parkway
  • Paving on Sagamore Parkway
  • New sidewalks and ramp leading to Memorial Island
  • New sidewalk and pavers around Memorial Island
  • Memorial Island at Columbian Park
  • Construction on Memorial Island
  • Construction on Memorial Island at Columbian Park
  • Memorial Island from across the lagoon
  • Construction on the Old National Bank Headquarters corner in the Marq building
  • Construction on the Old National Bank Headquarters corner in the Marq building
  • Marq building from the Big Four Depot
  • Side of Marq building that joins 2nd Street to pedestrian bridge
  • Back side of Marq building showing concrete walkway
  • Construction vehicles working on street paving preparation
  • Construction vehicles working on street paving preparation
  • Construction vehicles working on street paving preparation
  • Preparations to pour new curbs and sidewalk
  • A sewer catch basin on a street that is about to be paved
  • Preparing a street for paving
  • Excavation construction work
  • Street paving work
  • Construction on Erie Street for the Brown Street Sewer Project
  • Construction on Erie Street for the Brown Street Sewer Project
  • Construction on Erie Street for the Brown Street Sewer Project
  • Construction on Erie Street for the Brown Street Sewer Project
  • Construction on Erie Street for the Brown Street Sewer Project
  • Construction on Erie Street for the Brown Street Sewer Project
  • Excavation on the site of the Canal Road Combined Sewer Overflow Long Term Control Plan underground
  • Excavation on the site of the Canal Road Combined Sewer Overflow Long Term Control Plan underground
  • Excavation on the site of the Canal Road Combined Sewer Overflow Long Term Control Plan underground
  • Excavation on the site of the Canal Road Combined Sewer Overflow Long Term Control Plan underground
  • Excavation on the site of the Canal Road Combined Sewer Overflow Long Term Control Plan underground
  • A corner of Columbia Street with new paving, ramps, and crosswalk paint
  • A corner of Columbia Street with new paving, ramps, and crosswalk paint
  • A wide view looking east on Columbia Street showing new asphalt
  • A corner of Columbia Street with new paving, ramps, and crosswalk paint
  • A corner of Columbia Street with new paving, ramps, and crosswalk paint
  • ADA corner with ramp
  • A view looking across Brown Street showing new asphalt, pavers, sidewalk, and trees
  • A view looking down Brown Street showing new asphalt, pavers, sidewalk, and trees

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Projects and Progress - November 2017 photos