-
August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM
Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace2019-08-15T07:00:00J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
Event LocationLafayetteIN47901 J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
More Details
-
October 15, 2019, 7:00 AM - August 16, 2020, 5:00 PM
Lane Closures on Eastbound lanes 2100' N. Schuyler Ave. 10/15/19-8/16/20 water & sewer project2019-10-15T07:00:00Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
Event LocationLafayetteIN47901 Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
More Details
-
November 13, 2019, 7:00 AM - August 31, 2020, 5:00 PM
Sidewalk & parking closure also alley closure @ 1007 Main St 11/13/19-8/31/20 for construction of restaurant2019-11-13T07:00:00Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472
Event LocationLafayetteIN47901 Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472
More Details
-
June 22, 2020 - August 17, 2020
7th St Lane Closure2020-06-22T00:00:00The parking lanes of 7th Street from Main to South Street will be closed from June 22nd to August 17th for work on the Pearl River Sewer Relocation Project.
Contact: Daniel Hochstetler 317-220-5489
Event Location10 N 7thLafayetteIN47901 The parking lanes of 7th Street from Main to South Street will be closed from June 22nd to August 17th for work on the Pearl River Sewer Relocation Project.
Contact: Daniel Hochstetler 317-220-5489
More Details
-
July 22, 2020 - October 3, 2020
Twyckenham DIRECTION CHANGE2020-07-22T00:00:00Twyckenham Boulevard will be switching from west bound traffic in the north lane to east bound traffic in the south lane starting July 22nd and going until approximately October 3rd, 2020. The is for the next phase of construction.
Contact: Joe Ratcliff 765-427-4416 Milestone
Event Location730 Twyckenham BlvdLafayetteIN47901 Twyckenham Boulevard will be switching from west bound traffic in the north lane to east bound traffic in the south lane starting July 22nd and going until approximately October 3rd, 2020. The is for the next phase of construction.
Contact: Joe Ratcliff 765-427-4416 Milestone
More Details
-
July 24, 2020 - October 5, 2020
Main Street & 11th Street Road Closures2020-07-24T00:00:00Rieth Riley will be closing Main Street from the centerline to the right of way between 10th and 11th street. Westbound traffic on Main will have one lane of travel west. Eastbound traffic will be closed from 9th street and Main to 11th and Main. Follow the detour for (Eastbound main) going North on 9th to Ferry going east to 11th and going south to Main.
The west side parking on 11th will also be closed. They will also be closing the NW, SW, SE corners of Main Street & 10th street and 100' west of the NW corner and SW corner of the intersection of Main and 10th will be closed too.
Contact: Mike Rominger 765-656-4612 Rieth-Riley
Event Location1024 Main StLafayetteIN47901 Rieth Riley will be closing Main Street from the centerline to the right of way between 10th and 11th street. Westbound traffic on Main will have one lane of travel west. Eastbound traffic will be closed from 9th street and Main to 11th and Main. Follow the detour for (Eastbound main) going North on 9th to Ferry going east to 11th and going south to Main.
The west side parking on 11th will also be closed. They will also be closing the NW, SW, SE corners of Main Street & 10th street and 100' west of the NW corner and SW corner of the intersection of Main and 10th will be closed too.
Contact: Mike Rominger 765-656-4612 Rieth-Riley
More Details
-
August 3, 2020 - September 19, 2020
30th Street Road Closure2020-08-03T00:00:00S 30th Street will be closed from Teal Rd to Summer Street from August 3rd to September 19th. The detour route will be Sagamore Parkway, Maple Pointe Drive, Concord Road and Summer Street. Watch for signs and allow extra time.
Contact: Nikki Hauser 765-585-7332 Atlas Excavating
Event Location2626 S 30th StLafayetteIN47901 S 30th Street will be closed from Teal Rd to Summer Street from August 3rd to September 19th. The detour route will be Sagamore Parkway, Maple Pointe Drive, Concord Road and Summer Street. Watch for signs and allow extra time.
Contact: Nikki Hauser 765-585-7332 Atlas Excavating
More Details
-
August 8, 2020, 8:00 AM - September 18, 2020, 5:00 PM
Lane Closures on 36th St for road reconstruction starting 8/8 - 9/182020-08-08T08:00:00Lane closures are scheduled on 36th St from UPS property to Union Street from 8/8 - 9/18. The road will be restricted to one way either southbound or northbound. Please watch for signs indicating the one way restrictions.
For questions or concerns please contact Josh Coles.
Phone (317) 964-9519
Email josh.coles@milestonelp.com
Event Location117 N 36th StLafayetteIN47905 Lane closures are scheduled on 36th St from UPS property to Union Street from 8/8 - 9/18. The road will be restricted to one way either southbound or northbound. Please watch for signs indicating the one way restrictions.
For questions or concerns please contact Josh Coles.
Phone (317) 964-9519
Email josh.coles@milestonelp.com
More Details
-
August 13, 2020, 8:00 AM - September 18, 2020, 5:30 PM
Restrictions and Delays related to Asphalt Patching & Paving from US 52/25 Intersection to just South of Veterans Memorial Pkwy starting August 13 - September 18.2020-08-13T08:00:00There will be flagging operations between Us 52 and Veterans Memorial Pkwy. for asphalt patching and paving. Expect delays while crews work through the Veterans Memorial intersection. There will be various Paving equipment on site such as Milling machine, dump trucks, Broom, paver rollers, backhoe. Flaggers will be present with adequate signage to cover our work zones.
For questions or concerns please contact J.R. Beaman.
Phone (765) 404-4750
Email jbeaman@reith-riley.com
Event Location2806 US 231 SLafayetteIN47909 There will be flagging operations between Us 52 and Veterans Memorial Pkwy. for asphalt patching and paving. Expect delays while crews work through the Veterans Memorial intersection. There will be various Paving equipment on site such as Milling machine, dump trucks, Broom, paver rollers, backhoe. Flaggers will be present with adequate signage to cover our work zones.
For questions or concerns please contact J.R. Beaman.
Phone (765) 404-4750
Email jbeaman@reith-riley.com
More Details